Designed in Pryda software to meet floor trusses set down requirements

Based on the requirements for the new NCC 2022, a fall in the floor is now required to all floor wastes, including non-mandatory wastes. It means that we will see more set down areas for floor trusses. When choosing Pryda floor truss system, the reduced depth is designed in the Pryda software and prefabricated before arriving onsite, saving you time and money of cutting and sawing to meet the requirements. 

Check the videos to learn about the benefits of Pryda Floor Trusses explained by Structural Engineer Sashi Arjunan.